Construction water purification systems in power line construction, southern Germany

As part of the grid expansion, ZÜBLIN Umwelttechnik is supplying several systems for cleaning the construction water produced during the construction of a power line in southern Germany. Deferrization and filtration systems for flow rates of 10 to 33 liters per second were used in a modular design. This allowed the plant to be moved quickly and easily from site to site.
  • Picture of the construction water purification plant under the new power line ©ZUT
    Picture of the construction water purification plant under the new power line ©ZUT
  • Picture of the construction water purification system on a newly built electricity pylon ©ZUT
    Picture of the construction water purification system on a newly built electricity pylon ©ZUT
  • Picture of the production of a pumping station in Markgröningen ©ZUT
    Picture of the production of a pumping station in Markgröningen ©ZUT
Place
Southern Germany
Industry/client
Grid expansion
Parameters
Flow rate up to 120 m³/h
Special features
High logistical effort due to frequent relocation of systems and adjustments/extensions during the construction process
Performance period
Start of the middle 2024

Scope of services

  • Operation of the systems
  • Implementing the system technology
  • Assembly/disassembly
  • Settling basin
  • Construction water pumps
  • SK pipelines
  • Aeration basin
  • Sand filtration systems
  • Water activated carbon filter

Power line construction

As soon as ferrous water accumulates in the excavation pit of a new electricity pylon to be built, another mobile construction water purification system will be delivered and put into operation as quickly as possible.