Remediation incampus, Ingolstadt

The remediation of a former refinery site was successfully completed in 2023.
  • Aerial view of the floor washing plant in Ingolstadt © ZUT
    Aerial view of the floor washing plant in Ingolstadt © ZUT
  • hydraulic barrier © ZUT
    hydraulic barrier © ZUT
  • Air sparging system © ZUT
    Air sparging system © ZUT
  • Sludge treatment of the floor scrubber with a throughput capacity of 440 m³/h © ZUT
    Sludge treatment of the floor scrubber with a throughput capacity of 440 m³/h © ZUT
  • Honeycomb excavation for soil replacement: view of a drilling rig with leader-guided vibrator and excavator with long-arm grab © ZUT
    Honeycomb excavation for soil replacement: view of a drilling rig with leader-guided vibrator and excavator with long-arm grab © ZUT
Location
Ingolstadt
Industry/client
incampus GmbH, joint venture of AUDI AG and the city of Ingolstadt
Parameters
Total remediation site 75 ha, of which 50 ha on behalf of ARGE
Air sparging on 130,000 m²
Flow protection plant up to 230 m³/h
Soil washing plant for 430.000 t of contaminated soil, throughput up to 160 t/h
- Sludge treatment plant with 430 m³/h
- Wash water purification plant with 130 m³/h
Excavation using the honeycomb method on 50,000 m²
Excavation, removal and disposal Delivery and installation of 1,000,000 t of uncontaminated soil
Performance period
2017-2022

The remediation and preparation for construction of part of 50 hectares has been carried out since 2017 as part of a consortium under the technical management of ZÜBLIN Umwelttechnik. In addition to execution, the consortium is also responsible as a total contractor for selecting suitable measures, implementation planning, approval and documentation for official release from the register of contaminated sites. Following the remediation of the site, it will be gradually developed into an "Innovation Campus" for future-oriented technologies in the automotive sector.

History

  • 1965 to 2008 Refinery operation
  • 2009 to 2013 Dismantling of the refinery
  • 2017 Commissioning of the refurbishment of construction sites 2&3 to the consortium consisting of ZÜBLIN Umwelttechnik, STRABAG Umwelttechnik and the Geiger group of companies
  • 2023: Proof of achievement of the remediation targets
Film about the IN-Campus renovation ARGE IN-Campus
Film about the renovation measures at the incampus.

Scope of services

  • Remediation as a total contractor: planning and official approval, execution, assumption of extended refurbishment responsibility
  • Soil-washing plant with enclosure and ancillary facilities: design, construction, operation, dismantling
  • Conventional excavation and excavation using the honeycomb method
  • Simulation, installation and operation of hydraulic barrier with over 230 m³/h
  • Construction and operation of groundwater treatment plant with well gallery
  • Construction and dismantling of measuring points for groundwater and soil gas
  • Design, construction and operation of 8 air sparging systems with exhaust air treatment: regenerative post-combustion, catalytic oxidation (CATOX), flare (TNV) or air activated carbon filter
  • Land filling

In addition, parking spaces had to be made available for the neighboring sports facility during the project, and the resulting need to relocate parking spaces had to be incorporated into the construction process.