Lindane remediation, Hüningen

The site of a former production facility in the border triangle of France, Switzerland and Germany was redeveloped as part of a joint venture.
  • Aerial view of the enclosure over the landfill body ARGE MZ Hüningen
    Aerial view of the enclosure over the landfill body ARGE MZ Hüningen
  • Groundwater purification plant ARGE MZ Hüningen
    Groundwater purification plant ARGE MZ Hüningen
  • Enclosed loading station at the jetty ARGE MZ Hüningen
    Enclosed loading station at the jetty ARGE MZ Hüningen
  • Air purification system ARGE MZ Hüningen
    Air purification system ARGE MZ Hüningen
Place
Hüningen
Industry/client
Pharmaceutical company
Parameters
- Main pollutants: lindane, trichlorobenzene, benzene
- Foundation on steel girders up to 24 m long
- Excavation halls 30,000 m²
- Exhaust air treatment 175,000 m³/h
- Water treatment 350 m³/h
- Soil washing plant for 100,000 t, throughput approx. 20 t/h
- Excavation, removal and disposal of 800,000 t of contaminated soil and waste
Performance period
2014-2019

The site of a former production facility in the border triangle of France, Switzerland and Germany was remediated in a joint venture: The contaminated soil was excavated, partially washed and reinstalled, or treated in thermal plants throughout Europe. Depending on the concentration of HCH in the soil, it was transported by ship, closed containers or drums (HCH in its pure form).
The entire remediation area was enclosed and kept under constant negative pressure, the ship loading facility was encapsulated to prevent emissions during loading and special airlocks were used to load containers and drums. The construction equipment operated in the halls was equipped with ambient air-independent equipment cabins.

History of the location

  • 1947 to 1974 Production site for lindane (pesticide)
  • 1974 to 2012 Industrial wastewater treatment plant

Scope of services

  • Remediation of the landfill through excavation (800,000 t)
  • Enclosure of the landfill and operation under negative pressure
  • Classification, excavation and packaging of waste in special transport containers
  • Air and water purification
  • Intermodal transport, road/rail/barge
  • Disposal in thermal disposal facilities (700,000 t)
  • Backfilling and recultivation
Preview of the video ZUT
Project overview: Remediation of the former lindane production in Hüningen, ZÜBLIN Umwelttechnik